In 2025, the district completed a Long Range Master Facility Plan in collaboration with ARCON Associates and CS2 Design Group. The process included a comprehensive assessment of building needs and surveys of students, teachers, staff, and the broader school community to help identify current and future priorities at both schools. The assessment analyzed:
- Building envelope (roofing/walls/windows)
- Structural (shifting foundations/other)
- Mechanical (HVAC systems/other)
- Plumbing (water distribution systems)
- Electrical (power distribution)
- Accessibility (ADA compliance)
- Architectural (finishes/other)
- Educational space needs
- Performing arts space needs
- Athletics space needs
- Administrative space needs
- Site (asphalt paving/playfields)
In 2025, the District also completed a health, life, and safety facility assessment, a state-mandated review conducted every 10 years.